|
|
|
|
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
|
|
|
|
|
|
| Hydraulic Installation
Inspection: |
|
|
|
| |
Auxiliary circuit relief set
pressure: |
psi |
| |
Back pressure at attachment
point: |
psi |
| |
Piping Diameter(I.D.): |
inch |
| |
Circuit
is: |
Single Acting
|
Double
Acting
|
| |
|
|
|
|
| Pressure/Flow
Measurement: |
|
|
|
|
| |
|
Pressure |
|
|
Oil
Flow
|
|
| |
|
No Load |
|
|
gpm
|
|
| |
|
500 psi |
|
|
gpm |
|
| |
|
1500 psi |
|
|
gpm |
|
| |
|
2000 psi |
|
|
gpm |
|
| |
|
2300 psi |
|
|
gpm |
|
| |
|
2500 psi |
|
|
gpm |
|
| |
|
2800 psi |
|
|
gpm |
|
| |
|
|
|
|
|
|
| Breaker Pre-Delivery Inspection: |
|
|
|
| |
Oil condition good |
| |
Back cap nitrogen check |
| |
Bracket Bolts torqued to
specs |
| |
Accumulator charge check |
| |
Grease tool shank and
zerk fitting as per operation manual |
| |
Operate slowly and vertically, responding
tool frequently, for 30 minutes |
| |
Recheck bolt torque
after 8 hours operation |
| |
Instruct the customer
on proper operation and mainenance |
| |
|
|
|
|
|
|
| Inspector: |
|
|
|
| |
Name: |
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|